Built like a second home,
not a kit
From concept to keys, we engineer detached garages that look like a second home. Reinforced slabs, vapor-sealed envelopes, EV-ready panels, and finishes that match your house.
- TIMELINE
- 6–10 weeks from permit issuance
- FRAMING
- 2x6 KD + engineered
- EV CIRCUIT
- 240V / 60A
- INSULATION
- Spray foam R-24+
- DOOR R-VAL
- R-16 insulated steel

A detached garage finished to feel permanent, insulated, and visually tied to the home.
Permit-First
We handle drawings, zoning checks, and Committee of Adjustment when needed.
EV & Workshop Ready
200A sub-panels, dedicated EV circuits, and shop-grade lighting.
Sealed Envelope
Spray-foam options, weather-tight doors, year-round usability.
From drawing to keys
- M01
Site assessment
We measure setbacks, check zoning, and confirm grade, drainage, and access for materials.
- M02
Drawings & permits
Architectural drawings, structural details, and full City of Toronto permit submission.
- M03
Foundation & framing
Frost-depth footings, reinforced slab, and engineered framing inspected at each milestone.
- M04
Envelope & finishes
Insulation, vapor barrier, siding, roofing, doors, and electrical to match the main house.
- M05
Walkthrough & warranty
Final inspection, punch list, and written warranty on workmanship.
Spec'd for Canadian winters
- 2x6 KD framing with engineered headers
- Hardie, cedar, or steel cladding
- 30-year architectural shingles or standing seam
- Insulated steel garage doors (R-16+)
- Spray foam or batt + continuous insulation
Asked & answered
Do I need a permit?+
Yes — any detached garage over 10m² in Toronto requires a building permit. We handle the full submission.
Can it be EV-ready?+
Absolutely. We run a dedicated 240V circuit from your main panel and rough-in for a Level 2 charger.
Can it become a laneway suite later?+
We can frame and locate the slab so a future second storey or ADU conversion is straightforward.
